Melbourne GPO

Scope:

 1. The requirement for Built was to provide access to redirect & install new escalators for the H&M fit out.

 2. Whilst not interfering with the businesses operating inside the GPO.

Considerations:

 1. The void space was 9m wide and 20m long with only 600mm of floor space around the outside due to temporary containment walls.

Solution:

 1. Install a Allround Truss Birdcage supported on a Mezzanine level with access Level 1 & 2, the scaffold was completely contained from Level 1 allowing for the ground floor to be unaffected by the day works of the trades above.

Result:

Construction works were able to be performed during the day whilst businesses remained open removing the need for overtime works.

Project: Melbourne GPO

Info: Fit Out of H&M 2014

cLIENT: Built

Systems used:

  • Birdcage Scaffold
  • Bridge Truss